SME Server version 9.2 was very good. It always worked without problems after power lost
Different OS, and probably different hardware. Things change.
Can I interest you in a UPS??
You really should not be putting a machine into production unless it is fully configured AND tested AND backed up.
Trying a power off test whilst still configuring is liable to break any server. It is hardly a true test.
And if you are running this for business I can't imagine you would not use a UPS. It makes no sense.
Have not lost power but have got into a similar situation with a VM by just doing a stop in my impatrience
Indeed......
So, any server that gets a hard crash risks failure and leaving the system in an indeterminate state, hence using UPS to prevent it.
And regular backups for when that fails.
If you think you can make the software more 'crash proof' then please send us your patch.
In the meantime your real task is to prevent a hard crash.
Personally, if you are worried about a power cord being ripped out then get a real server, with dual PSUs in case one fails, and lock it in a rack with the rackmount UPS.
Even better, run Proxmox on it and put your SME in a VM and snaphot it...